Trade scope
Tile in Upstate SC
For builders: this scope, priced and leveled inside your Build Pack. For tile contractors: real plan sets to quote, $150 only when you win.
How do I get tile quotes in Upstate SC?
Your Build Pack prices tile where tile earns its keep: showers, bath floors, laundry, and backsplashes, with the waterproofing system named. Two tile bids with the same square footage can hide completely different showers behind the number, and the scope sheet is where that difference becomes visible.
What the tile scope sheet covers
- Shower walls, pans, and niches with waterproofing system named
- Bath and laundry floor tile areas from the plans
- Backsplash areas and edge treatment stated
- Tile allowance per square foot, or builder-supplied stated
- Pattern, size, and layout complexity acknowledged in the price
- Grout, movement joints, and trim profiles included
Why do tile bids come back so different?
The waterproofing is the shower. A bid built on a proper membrane system and one built on painted-on hope can be $2,000 apart and worlds apart. Leveling names the system, the pan construction, and the tile allowance, so the cheap bid has nowhere to hide.
That is what bid leveling fixes, and every tile bid in a pack arrives already leveled.
For contractors
Tile work without buying leads
Tile setters price from bath layouts and elevations with allowances stated. Joining the roster is free, your quote enters packs as approved, and the $150 per-scope fee applies only on a signed win.
Related scopes
Every neighboring trade, priced in the same pack
Answers
Tile questions
The waterproofing system by name, pan construction, wall areas, niches, the tile allowance, and grout. A shower quote that is just square footage times a rate tells you nothing about whether the shower will still be dry behind the walls in five years.
The per-square-foot budget for the tile itself inside the bid: the labor is fixed, the material floats with your selection. Your scope sheet states the allowance so you know exactly what selection level the number covers before you fall for a $14 tile.
Curbless looks incredible and needs planning before the slab or framing, not after. It touches concrete, framing, and tile scopes at once — precisely the coordination a Build Pack is for, because all three sheets state it together.
Get tile priced with every other trade.
Send your plans: scope count, exact flat fee, and delivery date confirmed the same day.